Public Notice for Storm Lift Station Excavation
Starting June 16th, there will be a lane shift in front of Bi Mart, allowing for the excavation and installation of the 25’ deep, 12’ diameter concrete wet well. The lane shift will utilize the existing shoulder width to the west, towards the Bi Mart Side of W 6th St.